WEEKS 9 to 11 - 10/02/11 - 10/22/11

Work has been performed on the parking area as lime stabilization materials were spread and compacted into the soil to create a stronger base for concrete parking lot. Forms were erected while rebar was placed and tied in preparation for the concrete that would later be poured and finished by hand. The lumber package arrived on site and the beginning stages of framing began as work was performed on the exterior walls.

Lime Stabilization



Rebar Concrete Pour Framing Lumber Package 7-Day Weather Forecast