Brick has been installed to the exterior walls of the building and continues to progress. The parking lot lights have arrived on site. The installation of gypsum board has begun as walls and ceiling surfaces were covered and prepared for texture and paint. Acoustical ceiling grid was also installed while HVAC ducts were run up in the mezzanine area of the building.
Masonry
No comments:
Post a Comment